Dimensions & weight
Length, width, height, gross weight and centre of gravity form the engineering basis for transport and handling.
- Verified dimensions
- Gross / unit weight
- Centre of gravity
Oversized, heavy and non-standard cargo should not move on assumptions. Aashmaan connects cargo facts, engineering, route feasibility, permissions, assigned resources and site handover into one movement plan.
Equipment, routing and handling should follow verified cargo data. The movement basis starts with the physical cargo, site interfaces and the constraints capable of stopping execution.
Length, width, height, gross weight and centre of gravity form the engineering basis for transport and handling.
Lift points, rigging, lashing and handling restrictions should be understood before equipment is selected.
Gate widths, turns, gradients, bridges, utilities, laydown areas and final site interfaces form part of the movement design.
Movement permissions, escorts, access controls and timing windows should be confirmed against the proposed move.
Trailer geometry, axle configuration, lifting resources and field support should be selected from verified cargo and route data.
Complex movements need one operating picture showing cargo, engineering, route, authority, resources and execution readiness before release.
Oversized movements are shaped by the narrowest physical and operational interface between origin and site — not simply by distance.
The exact engineering depth changes by project, but the control sequence remains visible from cargo facts through final evidence.
Capture cargo facts, handling points and origin / destination constraints.
Match cargo geometry with equipment, handling and restraint requirements.
Validate access, turns, gradients, clearances, bridges and site interfaces.
Confirm relevant permits, access controls, escorts and movement windows.
Assign suitable transport, lifting, field and control resources.
Control handovers, field communication, exceptions and movement status.
Capture condition, delivery evidence and unresolved actions.
A useful project review starts with enough physical and commercial information to identify engineering, route, authority and resource questions before mobilisation.
Start Project Pre-AssessmentEarly cargo, site and timing information helps expose issues that can otherwise appear after resources have already been mobilised.
Cargo description, dimensions, weight, quantity, centre of gravity where relevant, lift or support information, origin, destination, required timing and available drawings provide a useful starting point.
Equipment selection should be coordinated with verified cargo data and route feasibility. For non-standard moves, these decisions are connected rather than treated separately.
Project-specific lifting, handling and transport requirements can be coordinated as part of the movement plan. Suitable resources are verified against the actual requirement.
Depending on the movement, the review may consider access geometry, turns, gradients, road and bridge conditions, overhead clearances, utilities, movement windows, permits, escorts and final site access.
Yes. Where required, the movement can connect with freight, customs interfaces, port or terminal handling, inland transport and final site handover.
Mobilisation should follow confirmation of critical cargo facts, movement basis, route feasibility, required authority and suitable assigned resources for the specific project.